Typing
A monkeytype-style typing test with wpm, accuracy and personal bests
palupdated 2026-11-08FunIn pal's registry
In pal's registry: the button shows it in pal, which asks before installing; the command does the same from a terminal. This page can't see what your pal has installed.





What it does
A typing test in the style of monkeytype: common English words, a smooth caret, timed, word-count or free tests, and a result with wpm, accuracy, consistency and a chart. Personal bests and every past test are kept, with a stats page to follow your progress.
- Common English words that scroll as you type, each letter marked right, wrong or extra
- Timed (15 to 120 seconds), by word count (10 to 100) or zen, with punctuation and numbers if you like
- A pace caret to race your best, average or last test; stop on error by letter or by word
- Results: wpm, accuracy, raw speed, consistency, and a second-by-second chart with the mistakes
- Personal bests per kind of test, the average of your last ten, and a stats page with a progress chart
tabstarts a new test any time;ron the result repeats the same words- A leaderboard of words per minute for each plain time and word count; signed in, your bests and history follow you to your other machines and play.cagdas.io
Palettes 1
-
Typing
typingviewThe test. Type the words (in zen, anything; Enter ends it); Tab starts a new one; Escape leaves (a test in progress is dropped).
- ⇥New test
- ↵Zen: finish
- spaceThe next word; the letters left in this one are missed
- ⌫Take back a letter; at the start of a word, back into the one before if it was left wrong
- ⌥⌫Take back the word (ctrl+backspace too)
- ←Before the first key: a shorter test (right, a longer one)
- ↑Before the first key: time, words or zen (down too)
- ROn the result: the same words again
- ↵On the result: a new test
- SOn the result: stats and history (tab, enter or s again closes them)
Actions
- New testNew words, the same options; mid-test the test is dropped.⇥
- Repeat the testThe same words again, from the result.R
- Stats and historyThe stats button on the bar, S on the result, or cmd+k.S
- Change the testBefore the first key: up and down switch time and words, left and right the length.↑or↓or←or→
Settings
Extension, [extensions.typing]
pace_caretA second, fainter caret that moves at a steady speed for you to race: your personal best, the average of your last ten or your last test of the same kind (time 30, words 50 with punctuation, and so on). Nothing to race until you have finished one of that kind; never in zen. Also switched from ⌘K. One of off, pb, average, last.
stop_on_errorLetter: a wrong letter is not typed, the caret waits for the right one. Word: a word with a mistake cannot be left with space until it is fixed. Either way the wrong key counts against accuracy. Also switched from ⌘K. One of off, letter, word.
clockThe seconds left in a time test, or so far in zen. Off hides them: a time test still ends on time and the result shows how long it took. The word count of a words test stays. Also ⌘T or ⌘K.
Defaults shown. Change them in pal's settings window or in the config file.
The README
Everything Typing does, key by key, from the extension's own README.md
Typing
A typing test in the panel, in the manner of monkeytype. Enter on the
palette's row (or its hotkey) opens it as a view level whose tree is one
surface, the extension's own page (surface/): the options on a bar
at the top, three lines of words in the middle, the keys that do
something at the bottom. The title line names the test ("Typing · time
30", "Typing · words 50 · punctuation"); ⌘K lists a new test, every
length and mode, and the two toggles.
- The words: 244 common English words, drawn at random, never the same one twice in a row. Letters still to type are a quiet grey, typed ones turn full colour when right and red when wrong (the letter it should have been), extra letters trail in a darker red, and a word left wrong is underlined. The caret glides from letter to letter, and the box slides up a line when it reaches the third.
- The options: time (15, 30, 60, 120 seconds), words (10, 25, 50, 100) or zen; punctuation (capitals, sentences, commas, now and then a question, a colon, quotes, brackets, a dash) and numbers (a word now and then is 1 to 4 digits). Picked on the bar, with the arrows before the first key, or from ⌘K; kept across restarts.
- The test: the clock starts on the first key. A time test shows the seconds left above the words and ends when they run out; a words test shows the words done out of all and ends on the last word typed right (or a space on it). Zen has no words to copy: type anything, the counter shows the seconds so far, and Enter ends it (every letter counts as right, so it measures speed alone). While it runs the bar and the hints fade, and the pointer hides; moving the mouse brings them back.
- The result: wpm and accuracy large, a new best mark when it is one (else the best, and the average of the last ten of this kind); raw speed, the letters right, wrong, extra and missed, consistency and the time; a chart of the test second by second, with the wpm so far, each second's raw speed and its mistakes (hover for the numbers).
- Pace caret (setting
pace_caret, or ⌘K): a second, fainter caret gliding at a steady speed to race: your personal best, the average of your last ten or your last test of the same kind. Beside the best above the words it says the speed. Not in zen, and nothing to race until one test of that kind is done. - Stop on error (setting
stop_on_error, or ⌘K):letterrefuses a wrong letter (the caret shakes red and waits for the right one);wordwill not leave a word with a mistake in it on space. The refused key still counts against accuracy. - Clock (setting
clock, ⌘T or ⌘K): the seconds above the words, left in a time test or so far in zen. Off hides them for anyone a ticking number rushes: a time test still ends on time, and the result says how long it took. A words test's count (12/25) is progress, not time, and stays. - Stats: the
statsbutton on the bar,Son the result or ⌘K opens them over the test. Chips pick all tests or one kind (time 30,words 50 · punctuation); the figures (tests, time typing, highest and average wpm with the last ten, accuracy, consistency), a progress chart (every test a dot, the average of ten a line; hover for the test) and the history table (newest first, each kind's best crowned) follow the chip. The personal bests show all eight lengths for the options on the bar.←→switch the kind,↑↓scroll, Tab closes. - Tab starts a new test at any point; on the result Enter does too, and
Rrepeats the same words. Escape leaves; a test in progress is dropped, as it is when the panel hides mid-test.
The measures are monkeytype's (typing.ts has them in full): wpm counts
the letters of correctly typed words and their spaces, over five, per
minute; raw counts everything typed; accuracy is the keystrokes right
when pressed, so a mistake fixed still counts against it; consistency is
100 × (1 − tanh(v + v³/3 + v⁵/5)), v the coefficient of variation of the
per-second raw speeds. A test under 75% accuracy is not counted.
How it is built
typing.ts: the test, pure. A run is the words, what was typed for each and the keystrokes with their times;typeChar,typeSpaceandbackspaceare what a key does,resultscores it (the per-second samples included),fileputs it in the records,summary,rollingandkindsare the stats page's numbers. Also the options, the view's actions and the title, used by the extension and the page.words.ts: the word list andgenerate, which draws and dresses the words (the rng injected, so the tests pin a draw).index.ts: the view palette.viewanswers the surface with the actions and the title for the stored options; the page sends{ moved: true }after it saves them, and the extension pushes them again withview.update. An action picked from ⌘K goes to the page (pal.onAction).surface/: the page.main.tsholds the run, the keys, the clock and the saves, and draws incrementally (a key redraws the one word it touched; the caret is one element moved by a transform);chart.tsis the result's SVG chart,stats.tsthe stats page. Browser code:host/tsconfig.surface.jsonchecks it with the DOM types.
Keyboard
| keys | action | when |
|---|---|---|
| letters, digits, symbols | Type | the test |
space |
The next word; the letters left in this one are missed | the test |
backspace |
Take a letter back; at the start of a word, back into the one before if it was left wrong | the test |
alt+backspace, ctrl+backspace |
Take the word back | the test |
tab |
New test | any time |
enter |
Finish | zen |
←, → |
A shorter or longer test | before the first key |
↑, ↓ |
Time, words or zen | before the first key |
enter |
New test | the result |
r |
The same words again | the result |
s |
Stats and history | the result |
←, → |
All tests, or the kind before or after | stats |
↑, ↓ |
Scroll | stats |
tab, enter, s |
Back to the test | stats |
cmd+t |
Hide or show the clock (the clock setting) |
|
cmd+k |
New test, stats, every length and mode, punctuation, numbers, the settings | |
escape |
Leave; a test in progress is dropped |
Setup
Nothing to install and no permission. Three settings (Settings, or ⌘K in the test):
| setting | values | default |
|---|---|---|
pace_caret |
off, pb, average, last |
off |
stop_on_error |
off, letter, word |
off |
clock |
true, false |
true |
The options and the
records (the best of every kind of test, the last 1000 tests, the count
and the time typed) live in the extension's storage
(<data dir>/pal/storage/typing.json). Signed in to a pal account they
sync: the bests are stored as a list and the history merge by union
(reading keeps each kind's fastest), the counts by sum, the options by
field.
A counted plain test (time or words, no punctuation or numbers, not a
repeat) goes to its leaderboard, words per minute: time/15 to
time/120, words/10 to words/100. The result's note says where it
stands.
What it does not do
- Quotes, other languages or custom text.
- Themes of its own: it follows the panel's.
- Sound.
Platforms
macOS and Linux, the same on both: the page runs in the panel's webview.